  5. Atoll Phase 1, Egypt

Atoll Phase 1, Egypt

Completed: 2 December 2017

~45 mboed peak annual average production, net to BP
Atoll Phase 1, Egypt
“BP is focused on delivering growth with discipline, carefully choosing and efficiently executing high-quality projects. The longstanding partnerships we have in Egypt allowed us to fast-track Atoll’s development and deliver first gas only 33 months after discovery. This is a further demonstration of our commitment to help realise Egypt’s oil and gas potential and meet the increasing demand from its growing population.”
?

Bob Dudley, BP group chief executive

BP announced the Atoll discovery in March 2015. The main reservoir in the field contains an estimated 1.5 trillion cubic feet of gas and 31 million barrels of condensates, and further segments are under evaluation.

The Atoll Phase 1 project is an early production scheme involving the recompletion of an existing exploration well as a producing well, the drilling of two additional wells, the installation of the necessary subsea infrastructure, and upgrading of existing onshore facilities required to produce from the field.

The Atoll project was delivered 33 months after discovery, with test production starting on 2 December 2017, seven months ahead of the original plan. The project will produce up to 350 million standard cubic feet a day (mmscfd) gas and 10,000 barrels per day (bpd) condensate, which will be processed at the West Harbour facilities and fed into Egypt's national grid.

Location  Egypt
Operator Pharaonic Petroleum Company (PhPC)
Partners BP (100%)
Project type Conventional gas
Peak annual average production
~65 mboed(gross)
~45 mboed (net)
Atoll Phase 1, Egypt

Atoll’s exploration well reached 6400 metres in depth in 2015. That’s drilling further than the height of Mount Kilimanjaro (5,895 metres).

Atoll Phase 1, Egypt

Atoll’s wells on the seabed connect to new and existing production facilities. That subsea tieback is BP’s longest on record at 110 kilometres, almost as far as the distance between the Egyptian cities of Cairo and Suez.

Atoll Phase 1, Egypt

The Atoll project was delivered 33 months from discovery and seven months ahead of original plan.

Gallery

Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
Atoll Phase 1, Egypt
成人动漫黄频大全-成人动漫黄频大全视频成人动漫免费 成人动漫,引诱我的巨乳女邻居,巨乳高清版在线,成人动漫巨乳97总站成人动漫,邻居巨乳正在播放 不卡av电影在线_不卡的成人动漫电影_每日更新成人动漫av_不卡的无码高清的av 做爱全过程 |成人动漫|av女优|成人动漫|日本av|好成人动漫|av成人动漫|三级片|成人动漫|在线av 一级A做爰片成人动漫_免费成人动漫成人动漫2018 成人动漫av不卡免费播放_在线看片av成人动漫_日本毛片高清成人动漫_成人动漫亚洲区成人动漫 好屌色_青青草_青青草公开视频_青青草成人动漫视频_青青草在线 成人动漫,日本一级大片在线播放,美国一级做人爱视频